Rudram logoRudram
Manufacturing Pilot

Case Study

Manufacturing Pilot

The Challenge

A mid-sized manufacturing client was struggling with inventory management. They knew there were inefficiencies but couldn't pinpoint them in their scattered data.

The Solution

Our Data Health Check connected their procurement, production, and waste management systems. We deployed a unified data model to track material flow from entry to exit.

The Result

We identified a consistent material leakage issue in one of their production lines, amounting to nearly $AUD 600,000 in annual losses. We built a simple, real-time dashboard to monitor this variance, allowing them to fix the process and prevent future losses.

Annual Savings

$AUD 600,000

Ready to see results like this?